Hotels

Project Value Details
The Apex Hotel,
London
£1.5m Full mechanical and electrical services to 49 bedroom extension to existing hotel
Chancery Court Hotel,
London
£30k Modifications to existing heating, chilled and domestic services to facilitate a new health spa

Christchurch Harbour Hotel
(formerly Avonmouth Hotel)

£1.9m Design and build – mechanical and electrical services extension to existing hotel
Express by Holiday Inn,
Blackfriars
£250k Design and installation of chilled water comfort cooling system
Express by Holiday Inn,
Burton on Trent
£240k Design and installation of chilled water comfort cooling system
Express by Holiday Inn,
Cardiff
£260k Design and installation of chilled water comfort cooling system
Express by Holiday Inn,
Hammersmith
£288k Mechanical and electrical services installation to 135 no bedrooms for comfort cooling
Express by Holiday Inn,
Wimbledon
£122k Mechanical and electrical services installation to 83 no bedrooms for comfort cooling
Hilton Hotel,
Kensington
£22k Refurbishment of new meeting rooms consisting of fresh air ventilation and air conditioning systems
Hilton Hotel,
Kensington, Executive Lounge
Circa £30k Refurbishment of ground floor hotel offices, air conditioning installation
Hilton Hotel,
Bracknell
£50k Design and installation of DX comfort cooling into restaurant area
Hotel Russell,
Russell Square, London
£1.27m Refurbishment of domestic services and new air conditioning to 188 no bedrooms and associated corridors and public areas
Hotel Stakis,
Islington
£70k Design and installation of DX comfort cooling into offices

Hyatt Regency London,
The Churchill

£4.5m Refurbishment of occupied hotel, levels 2, 3, 4, 5, 6, 7, 8 and 9, together with refurbishment of basement, back of house and 6 no plant rooms
Hyatt Regency London,
The Churchill
£850k Infrastructure replacement

London Hilton, Park Lane
14th, 15th, 20th, 21st Floor

£80k Refurbishment to 8 suites
London Hilton, Park Lane £5.7m Refurbishment – Floors 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 28
London Hilton, Park Lane £2.1m Millennium project – Full mechanical refurbishment of ballrooms, public areas, traders and back of house areas, including the replacement of capital plant whilst keeping the hotel fully operational
Mollington Banastre Hotel £280k Mechanical services refurbishment to health club, swimming pool and changing facilities
Sheraton Heathrow Hotel  £1.2m Design and build mechanical and electrical services associated with refurbishment of existing kitchen and new conferencing facility
The Dorchester Hotel £51k Installation of air conditioning and fresh air system
The Dorchester Hotel £436k Refurbishment of existing spa/leisure facilities with mechanical services
The Metropolitan Hotel,
London
£2.4m Design and build complete services re-fit to Park Lane Hotel, Met Bar and Nobu Restaurant
Trafalgar Hotel,
London
£8k Modifications to ventilation systems and relocation of fan coil units
Travelodge T5,
Heathrow
£2.3m Design and build - mechanical and electrical services to a new 297 bedroom hotel
Travelodge,
Waterloo
£1.9m Part refurbishment and part new build of a 279 room Hotel with mechanical and electrical services design and build installation.