| Project |
Value |
Details |
| 22 Manchester Square, London |
£300k |
Refurbishment of a 5 storey office block with
Full data installation including lighting controls, fire alarm, security and video access systems |
127-133 Charing Cross Road, London |
£1.24m |
Pre-designed refurbishment of existing offices with air conditioning, electrical and mechanical services |
| 154-156 Fenchurch Street, London |
£1.6m |
Refurbishment of offices with electrical and mechanical services |
| 175 Oxford Street, London |
£530k |
Installation of mechanical services to new build 4 storey office and retail unit |
| Albion House, Newbury |
£275k |
Albion House, Newbury |
Adelphi Building, Robert Street,
12th Floor |
£120k |
Remedial works to offices |
| B&Q plc, Chandlers Ford |
£2.2m |
Mechanical services installation to new headquarters |
| Bankside House, London |
£157k |
Design and installation of the air conditioning and electrical Services |
| Basil Street, London |
£2.2m |
Full mechanical and electrical services installation to 7 storey building converting from hotel to commercial offices |
| Bedford Row, London |
£80k |
Installation of electrical services to existing offices |
| Biocompatibles, Farnham |
£382k |
Installation of comfort cooling and ventilation to the office areas, together with laboratory water/compressed air services |
| Bridport Employment Office |
£350k |
Mechanical services installation to new offices |
| British Telecom, Oxford |
£275k |
Complete mechanical services installation to ‘Project Focus’ blocks A and B |
| Building 1-224 Portsmouth Dockyard |
£34k |
Air conditioning to existing refurbished offices |
| Building 2-261 HM Naval Base, Portsmouth |
£120k |
Installation of new LTHW system in office development |
| Cable & Wireless, Lakeside House, Bracknell |
£150 |
Replacement of LTHW and chilled water pipework to new fan coil units in occupied offices |
| Centrica, Staines |
£432k |
Pre-designed air conditioning to refurbished office building |
| Centrica, Stockport |
£599k |
Mechanical and electrical services refurbishment to an occupied call centre |
| City Park, Hove |
£2.6m |
Mechanical and electrical services to new corporate office development |
| City Road, London |
£309k |
Office refurbishment installation of new VRF equipment, centralised air handling unit with associated chilled water |
| Curzon Street, London |
£50k |
Office refurbishment air conditioning, ventilation and plumbing |
| De La Rue, Portals |
£340k |
Building services to corporate management offices |
| De La Rue, Havant |
£400k |
Management suite air conditioning |
| Digital Equipment Ltd, Reading |
£400k |
Refurbishment to offices Dec Park II |
| Digital, Enterprise House, Reading |
£150k |
Remedial mechanical services and acoustics package |
| Digital Comfort Cooling for Offices, Reading |
Circa £100k |
Air conditioning and ventilation installation |
| Dorset Emergency Services, Poole |
£5.45m |
Mechanical and electrical services installation to new build emergency services headquarters |
| East Street, Epsom |
£500k |
Design and build mechanical and electrical installation to a new office development |
| EMAP, Shaftesbury Avenue |
£116k |
Refurbished 3 floors of an open plan office, air conditioning, ventilation and plumbing |
| Fairy Microfiltrex, Fareham |
£140k |
Design of DX comfort cooling system into multiple offices |
| Gap European House, London |
£600k |
Refurbishment of 6th and 1st floors |
| Global Crossing, Basingstoke |
£100k |
Phase 1 air conditioning to hi-tech office suites and comms room |
| GTS, Reading |
£200k |
Phased air conditioning to computer room and offices |
| Guinness, Coniston House |
£650k |
Installation of air conditioning to occupied office building |
| Halliburton, Brown & Root |
£400k |
Air conditioning to management suites within occupied building |
| Hampshire Constabulary, Netley |
£430k |
Command and Control Centre, Netley |
| Hercules House |
£134k |
A fast track ground floor office refurbishment within an occupied government building installing mechanical services |
| Horizon Business Village, Weybridge |
£900k |
Design and installation of mechanical and electrical services to 16 office units |
| Jermyn Street, London |
£1.0m |
Design, installation and commissioning of the Mechanical and Electrical services and Sanitaryware Works |
| Jetstream, Eastleigh |
£1.2m |
Design and installation of the mechanical services to 3 no high quality air conditioned office block at Southampton International Park Airport |
| Job Centre Plus, Bournemouth |
£1.4m |
Installation of chilled beams, associated mechanical services and electrical services for new Department of Works and Pensions building |
| Johnson and Johnson, High Wycombe |
£1.5m |
Full mechanical services refurbishment to existing offices |
Joint Communications Centre, Devizes |
£800k |
Full mechanical services installation for the Command and Control Centre |
| KPMG, Watford |
£1.2m |
Office refurbishment to existing offices. Mechanical and electrical services |
Lyric House, 149 Hammersmith Road, London |
£400k |
Refurbishment of 5 storey offices with Mechanical, Electrical and Air Conditioning Services |
| Mill House, Poyle |
£448k |
Refurbishment to existing offices. Mechanical, electrical services and associated services |
| Market Towers, Nine Elms |
£200k |
Plant room refurbishment |
| Notebeme House, Southampton |
£140k |
Design and installation of mechanical and electrical services to new office block |
| P&O, Borehamwood |
£374k |
Mechanical services to 2 storey open plan office with chillers in the roof space |
| P&O, Peninsular House, Portsmouth |
£352k |
Refurbishment of 5 floor office building into open plan for mechanical and electrical services. Design and installation of new DX comfort cooling and ventilation systems |
P & O, Richmond House, Southampton |
£875k |
Specialist air conditioning design and build refit to prestigious office block |
P & O, 247 Tottenham Court Road, London |
£253k |
Refurbishment of mechanical and electrical services to the first floor |
Plot C, Solent Business Park, Whiteley |
£1.34m |
Full mechanical and electrical services design and build project to prestigious 3 storey new office development. Heat recovery air conditioning, solar heating to hot water services, high efficiency lighting system |
| Portsmouth Combined Court |
£200k |
Pre-designed project consisting of new LTHW fan coil unit and pipework installation, also new small power and lighting installation |
| Portsmouth Foundry Building |
£300k |
Air conditioning to 3 storey listed building |
| Red Central, Redhill |
£1.2m |
Design and build mechanical and electrical services to new office development |
| Regional Business Centre |
£2.3m |
Design and installation of Mechanical and Electrical Services to New Business Centre in Southampton City Centre |
| Research Machines, Abington |
£575k |
Underfloor air conditioning services additions to specialist office and technical laboratory areas |
| Ringwood Employment Office |
£350k |
Mechanical services installation to new offices |
| S C Johnson Wax, Farnham |
£180k |
Computer room fit out |
| Saga, Folkestone |
£1.4m |
Provision of mechanical services to a 6 floor office building in a rotational pattern to enable the Client to continue working within the building |
| Scandinavian Bank, London |
£1.8m |
Refurbishment of Bank Dealing Rooms |
| Southway House, Guinness Brewery |
£25k |
Air conditioning to existing offices |
| Swaythling Housing Association |
£850k |
Design and build air conditioning and mechanical services to new head office and associated stores building |
| Swedish Match |
£225k |
Design and installation of mechanical and electrical services |
| St Anne House, Croydon |
£1.4m |
Design and build mechanical and electrical services refurbishment of a 13 storey office block, including roof level plant |
| Thales, Hedge End |
£220k |
Design and build, air conditioning and electrical refurbishment of 4 office levels including computer suites |
| The Beeches, Hurst |
£350k |
Air conditioning installation to 12 no new build business units |
| TWM, Epsom |
£185k |
3 phased office refurbishment of air conditioning and ventilation services |
| Tottenham Court Road, London |
£906k |
Full mechanical and electrical services project to existing offices |
Trans Word International/IMG
McCormack House |
£965k |
Design and build air conditioning to third, fourth, fifth and sixth floor offices |
| Travelex, Peterborough |
£554k |
Installation of mechanical services to refurbish an existing office facility whilst still in full occupation |
| Wilkinson Sword |
£225k |
Design and build, air conditioning and electrical refurbishment of 2 office levels |